Business:
- Property Development and Construction
- Industrial Supplies
- Timber and Palm Oil Plantation
- Investment Holdings and Others
Property Development:
- On-going project namely Ganggarak Permai at Labuan.
- Mizumi Residences at Kepong. Project Gross Development Value is approximately RM981 million, against development cost at RM735 million.
Industrial Supplies
- Production and supply of ready-mixed concrete is located at Ganggarak, Labuan.
Timber and Palm Oil Plantation
- Palm oil plant in Indonesia. Still planting. Loss RM9 million.
Energy Business
- TRB was awarded by the Energy Commission for the development of new 1,000MW-1,200MW combined cycle gas-fired power plant (EPCC) (the CCGT plant) which will be situated at Pulau Indah. No revenue in FY2017.
Key Share holders:
- Datuk Seri Anuar Bin Adam, 30.25%
- Datuk Seri Chiau Beng Teik, 5.11% (Chin Chin’s Boss)
key Note:
- On 27 April 2016, TRB announced the 1 bonus share for existing 10 shares.
- On 15 November 2016, Private Placement 49,850,300 new TRB share RM0.40/ share
- On 7 December 2016, TRB announced a proposal to undertake a renounceable rights issue of up to 219,341,357 new ordinary shares together with up to 383,847,374 free detachable warrants. 2 Right shares for every five (5) existing TRB share . Seven (7) warrants for every four (4) Rights Shares.
开始读年报。看到TRB的Chairman Statement时,他说房地产的业绩,跳3倍。我还以为是赚钱的公司。但是,营业增加,公司还是亏钱。而且TRB还买回自己公司的股票。
我个人认为1星。
以下是其他部落格有关TRB的文章:
以下是其他部落格有关TRB的文章:
整篇文章并没有任何买卖建议,或推高股压低价的其他企图,单纯分享我的功课,本人"怒"不对你的盈亏负任何责任,谢谢。
No comments:
Post a Comment